Friday, August 1, 2014

Opening the STM Chamber


  1. Turn off the STM controller box completely (software off, HV off, LV off, capacitors off).


  2. Turn off other items such as mass spec or sputter gun controller.
  3. Turn off both ion pumps (located on the bottom shelf of the cart).
  4. Turn off both ion gauges (flip off back switch on controller (top of cart)).

  5. Close the turbo/chamber valve and the turbo/rough valve (both are electrically controlled so just unplug the appropriate power cords).
  6. Turn off the turbo (unplug) and allow to spin down.
  7. Turn off the rough pump.
  8. Give some time to allow filaments to cool.
  9. Leak a low pressure of nitrogen gas into the chamber via the vent valve. The bellow below the STM will deflate appropriately when the chamber reaches ambient pressure.
  10. Open the bottom flange to unhook the STM chains. Cover with foil when not in use.
  11. Disconnect the electrical connectors atop the STM.
  12. Open the STM flange on the table.
  13. Use three wire cables and attach to the ceiling crank. Slowly lift up the STM and place to rest on the STM holder.
Extra Notes: Always store the bolts and nuts in a place so that you will not have to search later to replace them. When possible, cover opened flanges with foil so as to minimize chamber contamination.